Apply for New LESCO Connection Online – Step by Step Guide (2025)
If you’ve recently built a new house, shop, or office in Lahore, you’ll need a new LESCO connection. Thankfully, the process is now digital and transparent, saving you long trips to LESCO offices.
In this guide, we’ll explain:
- Who can apply for a LESCO new connection
- Required documents
- Step-by-step application process (online & offline)
- Fees & processing time
- How to track your application
Who Can Apply for a LESCO New Connection?
Anyone who owns or rents a property (residential, commercial, or industrial) in LESCO’s jurisdiction can apply.
Eligible categories:
- Residential users (homes, apartments, portions)
- Commercial users (shops, plazas, small businesses)
- Industrial consumers (factories, workshops)
- Agricultural tube wells
LESCO New Connection Portal homepage.
Documents Required for New Connection
Before applying, prepare scanned copies of the following documents:
| Document | Purpose | Notes |
| CNIC copy | Applicant’s identification | Must be valid and clear |
| Proof of ownership | Property papers, registry, allotment letter | If rented, attach tenancy agreement |
| Undertaking /Affidavit | Statement of no illegal connection | Downloadable from LESCCO site |
| Neighbors’ electricity bill copy | For location verification | Optional but recommended |
| Wiring Test Report (WTI) | Certificate from licensed electrician | For load >1 kW |
| Two passport-size photos | Applicant’s ID | Soft copies accepted |
Step-by-Step Application Process (Online)
Follow these steps to apply for a new LESCO connection online:
Step 1: Visit ENC (Electricity New Connection) Portal
Go to the official ENC Portal (used by all DISCOs including LESCO).
Step 2: Fill Out the Application Form
Provide details such as:
- Applicant’s name, CNIC, father’s name
- Property address & nearest consumer number (neighbor’s bill)
- Connection type (domestic, commercial, industrial)
- Load requirement (kW)
Step 3: Upload Required Documents
Attach scanned copies of CNIC, property papers, affidavit, etc.
Step 4: Submit Application & Print Tracking ID
After submission, you’ll get an Application Tracking ID. Save and print it.
Step 5: Verification & Site Inspection
- LESCO staff will verify your documents.
- A team may visit your site for inspection of wiring & load requirement.
Step 6: Pay Security Fee
You’ll receive a demand notice (via portal or office). This includes:
- Security deposit (refundable)
- Service connection charges
Pay at any bank branch, Easypaisa, or JazzCash.
Step 7: Meter Installation
After payment, LESCO schedules meter installation at your property. Timeline: Usually 30–45 days from application submission.
LESCO New Connection Fees & Charges
Charges depend on load, category, and type of connection.
| Category | Security Deposit (PKR) | Service Charges (PKR) | Approx. Total (PKR) |
| Residential (1 Phase) | 4,000-6,000 | 2,000-4,000 | 6,000-10,000 |
| Commercial (3 Phase) | 10,000-20,000 | 5,000-10,000 | 15,000-30,000 |
| Industrial | Varies (based on load) | High Charges | case-by-case |
Note: Fees are NEPRA-approved and may change annually.
Processing Time for New Connection
LESCO follows NEPRA’s service timelines:
| Load Requirement | Processing Time |
| Up to 15 kW (Residential/Commercial) | 30 days |
| 16–70 kW (Small Industry) | 45 days |
| Above 70 kW (Large Industry) | 60-90 days |
Delays may occur if documents are incomplete or fees are unpaid.
How to Track Your Application
You can check your LESCO new connection status using:
- ENC Portal: Enter tracking ID.
- LESCO Helpline 118: Call with CNIC or ID.
- LESCO Office: Visit nearest office with your tracking slip.
Offline (Manual) Application Process
If you prefer visiting an office:
- Collect application form from LESCO Customer Service Center.
- Fill & attach required documents.
- Submit to office → get tracking ID.
- Pay security deposit & service charges at bank.
- Wait for inspection + meter installation.
Tips for Smooth New Connection Approval
- Double-check all documents before submission.
- Ensure wiring is tested & certified by licensed electrician.
- Pay fees promptly after demand notice.
- Track status regularly to avoid delays.
Conclusion
Applying for a LESCO new connection in 2025 is easier than ever thanks to the ENC online portal. With the right documents and timely fee payments, you can get your meter installed in 30–45 days.
Pro Tip: Always use the official ENC Portal or billlescoonline.pk for secure application tracking.
Frequently Asked Questions (FAQs)
Q1. How long does it take to get a new LESCO connection?
Usually 30 days for domestic users, but industrial connections may take longer.
Q2. Can I apply for a LESCO new connection online?
Yes. Use the official ENC Portal to submit your application digitally.
Q3. What are the main charges for a new connection?
Security deposit + service connection charges, depending on load and category.
Q4. Can tenants apply for a new connection?
Yes, but they must provide a tenancy agreement + owner’s NOC.
Q5. How can I track my application status?
Enter your tracking ID on the ENC portal, or call LESCO helpline 118.